18-24 April 2014 #703

Infographic: High Tension in Sindhuli

Ayesha Shakya

Text by: RAMESH KUMAR in SINDHULI

A major transmission line that will feed electricity from several new hydropower projects in the Tama Kosi Valley to the national grid has been stuck for over two years now because of extortion by locals in Sindhuli.

Our infographic highlights the major points related to the obstruction.

comments powered by Disqus